Directions: Refer to the following tables and answer the questions given below.

P
Godowns  Quantity available 
1
2
3
150
220
190
Q
Outlets  Quantity required  
A
B
C
220
140
180
Transportation cost per unit in (Rs.)
              Godowns                                       Outlets                     
   A       B       C   
1
2
3
8
5
4
6
3
9
10
7
12
Expert Choice Similar Sets
3.0

Moderate

user rating

based on 1 votes

Rate this
important for :
IBPSPO MAT SBIPO

  • 1.
    If only godown 2 was available, at what minimum cost can it supply all quantity available?
    A. ₹ 1120 B. ₹ 820
    C. ₹ 370 D. ₹ 560

  • 2.
    If only outlet A is present, what will be the minimum cost of supply?
    A. ₹ 910 B. ₹ 730
    C. ₹ 640 D. ₹ 1010

  • 3.
    If only godown 3 was available, at what minimum cost can it supply all the quantity available?
    A. ₹ 910 B. ₹ 820
    C. ₹ 760 D. ₹ 1120

  • 4.
    If godown 2 is shut down and it’s availability is divided equally between the godowns 1 and 3, which of the two godowns can exhaust it’s availability more economically and at what cost?
    A. 1, ₹ 1600 B. 1, ₹ 1800
    C. 3, ₹ 1600 D. 3, ₹ 1800

  • 5. The goods shipping matrix is shown below

         Godowns            A           B            C     
    1
    2
    3
    30
    25
    60
    40
    70
    30


    What is the total cost incurred?

    A. ₹ 1210 B. ₹ 1695
    C. ₹ 1815 D. ₹ 965